Most installations tend to upgrade their CPCs to the equivalent model in the newer generation – for example, from a z13 710 to a z15 710. Accordingly, IBM’s capacity planning tools are designed to model upgrades to newer generations within the same speed range (7xx to 7xx, 5xx to 5xx, and so on).

There are numerous stories of customers moving to a lower speed range (z13 7xx to z15 6xx, for example) and finding that the performance exceeds their expectations.

But if the IBM tools are not intended to model such moves, how do you evaluate if such an upgrade would be right for your workloads?

In this session, Frank and Todd will discuss the attributes that they use to evaluate such upgrades.

Is a Sub-Capacity CPC the Right Move for You?

        
    

        
    

You May Also Be Interested In:

Webinar

From CPU MF Counters to z16 Invoices: Thoughts on the Impact of Processor Cache Measurements | IntelliMagic zAcademy

The z16 introduced substantial processor cache design changes. Learn how this impacts the operation and efficiency of your workloads.

Watch Webinar
Webinar

CPU Reporting and Tuning in a TFP Environment | IntelliMagic zAcademy

The Software Consumption solution within TFP brings with it a fundamental change in how sites will approach managing and reducing software expense

Watch Webinar
Blog

Mainframe Cost Savings Part 2: 4HRA, zIIP Overflow, XCF, and Db2 Memory

This blog covers several CPU reduction areas, including, moving work outside the monthly peak R4HA interval, reducing zIIP overflow, reducing XCF volumes, and leveraging Db2 memory to reduce I/Os.

Read more

Find more zAcademy Resources